Pile driving: where every build starts
Before there is a floor, a roof or a lift, there are piles driven into the lake bed from a work barge.
Three of the Twin Lakes job videos show this stage: the barge with the driving rig, the crew guiding each pole into place, and the grid of piles standing in the water afterwards. It happens in every season. The Serenity Shores piles went in on January 12, 2026, and two days later the floor system was already on them.
What to expect
From a work barge
The driving rig works from a barge on the water, right at the shoreline.
Every season
September 2025, January 2026, June 2026: piles went in on three jobs across three seasons.
Then the floor system
At Serenity Shores the floor framing followed the piles two days later.
Shared foundation
Docks, piers and boathouses all start the same way.
On real Twin Lakes jobs
Build logs with this work
- Sundeck boathouse in Joyceville (In progress at the last update, Aug 4, 2026)
- Winter build in Serenity Shores (Roof complete Feb 19, 2026)
- Boathouse with lifts, fall 2025 (Lifts installed Oct 14, 2025)