Twin LakesBoathouse & Pier 252-399-1566
Roof complete Feb 19, 2026

Winter build in Serenity Shores

Piles went in on January 12 and the roof was finished on February 19, 2026. A hip-roof boathouse with an enclosed room, built through the winter.

Serenity Shores, Lake Gaston

Winter build in Serenity Shores

The build, as it was posted

Dates and quotes come from the Twin Lakes job posts. Customer names are left out.

  1. Jan 12, 2026 (frame from the job video)

    Piles driven

    “Piles driven at the jobsite in Serenity Shores.”

    Pressure-treated piles set in a grid, with the first cross members already on.

  2. Jan 14, 2026

    Floor system

    “Floor system installed at the job in Serenity Shores.”

    Two days after the piles, the floor framing is on.

  3. Jan 22, 2026

    Upper band

    “Upper band installation at the job in Serenity Shores.”

    The band ties the tops of the posts together and carries the roof.

  4. Feb 19, 2026

    Roof complete

    “Roof installation complete. Ready for boatlifts and electrical.”

    Shingled hip roof over the slip and the room.

Next build: Hip-roof boathouse in Fox Hollow

Tell Burwell what you want on your shoreline.

Slip size, roof height, a room, a sundeck, a lift. Call, or send the details and we will get back to you.

252-399-1566