Boat lifts, set in a slip built for them
Lifts go in once the roof is on, in a slip sized around your boat, and the job is left ready for electrical.

On a Twin Lakes boathouse the lift is part of the plan from the first pile. The slip is laid out for your boat, the roof is built high enough for it, and the lift goes in near the end of the build. The job posts mark the moment plainly: "Boatlifts are installed. Ready for electrical." And the service does not stop there: one owner writes that Burwell came back after completion to troubleshoot their lift.
What to expect
Sized to the slip
An oversized slip and a raised roof, in one owner's words, to suit their needs.
Installed near the end
On the fall 2025 job the shingles went on October 9 and the lifts on October 14.
Ready for electrical
Once the lifts are in, the boathouse is ready for the electrical hookup. Ask Burwell how the wiring is handled.
Help after the build
"Burwell has gone the extra mile troubleshooting our lift," from the owner's review.
On real Twin Lakes jobs
Build logs with this work
- Boathouse with lifts, fall 2025 (Lifts installed Oct 14, 2025)
- Winter build in Serenity Shores (Roof complete Feb 19, 2026)